Baghdad International Airport (BIAP)

Caravan Hotel

Key Information:
Completion Date:
24 March 2008
Owner:
ICAA (Iraqi Civil Aviation Authority)
Project Goal:
to provide a temporary hotel which offers high standard
accommodation for business travelers and occupants of the BIAP Economic Zone.

Security:
- 2.5m fence surrounding compound with privacy screen.
- 2 Entrances (1 guest, 1 service) fully staffed by Global Security 24 hrs.
- Illuminate parking area and compound.
- Management Company provides additional internal security.
Power:
Hotel is on a stand alone grid with redundant power on site.
Water:
- Potable water-- bottled water
- Shower and toilet water-- in tanks on site.
Parking:
lighted parking area with spaces for 40 cars.
Key Information:
Rooms:

80x “Type A”
Queen size bed, private bathroom with shower, wireless internet, flat screen TV,
microwave, mini-refrigerator, telephone to front desk

20x “Type B”
2xTwin size beds, private bathroom with shower, wireless internet, flat screen
TV, microwave, flat screen TV, kitchenette, telephone to front desk
Restaurant:

Bar:
Wet bar with a seating capacity of at least 10 people including sink, ice maker,
drink coolers.
Internet Cafe:
At least two work stations with desktop computers and high speed internet
access*
* there is wireless internet in every room as well as the lobby
Gym:
5 cardio machines, a universal gym, personal stretching/workout space.
Equipment will be commercial grade quality with at least 2 stationary bicycles,
2 treadmills and one cross-trainer machine.
Medical Aid Station:
One aid room staffed by a full time employee to provide basic first aid care.
Laundry Facility:
Commercial grade laundry facilities on site for all hotel and restaurant linens
and guest usage.

Management Contract Base Elements:
-
Automated reservation and booking system
-
Full time hotel manager, 2 assistants
-
Full service lobby operations
-
Shuttle bus service to BIAP
-
Full maintenance staff
-
Full janitorial staff
-
Full restaurant and bar staff
-
Full internal security staff

Key Information:
Completion Date:
28 February 2008
Owner:
Iraqi Airways
Project Intent:
To provide an international class business facility to spur
economic growth.
Security:
To be provided by the property management company, no less than one ECP at the parking lot entrance and one security station in the building lobby.
Power:
Office Building is connected to the BIAP main electrical power grid
Water:
building is connected to the BIAP water supply; potable water to be
provided in bottled water form by building management.
Sewage:
building is connected to the BIAP sewage system
Parking:
spaces for 150 cars.
Cafeteria:
fully functioning cafeteria to service all building occupants to be
managed by property management company.
Office Spaces:
6 floors of scalable office space/meeting rooms. Can accommodate
up to 500 tenants and over 19,000 sq meters of office space.
Internet Connectivity:
the building is wired for internet access in every office
space/meeting room.
Office Rental Rates:
TBD- property management contractor not selected.

Key Information:
Completion Date:
20 MAR 08
Owner: I
CAA (Iraqi Civil Aviation Authority)
Project Goal:
to provide convention center space for large scale trade
conferences and other business functions.
Convention Space:
Over 170,000sq ft of convention space in two buildings.
Office Space:
Bldg #2 has over 30 additional office spaces
Power:
Convention Centers are tied into the BIAP electrical grid
Water:
Water system is tied into the BIAP drinking water system
Business Development and Marketing Company to perform the following services:
-
Additional conference security
-
Advertising and marketing
-
Business services
-
Office space leasing and operations
-
Convention/exhibition fees TBD
Facilities Management Contractor to perform the following services:
-
HVAC maintenance
-
IT maintenance
-
Electrical maintenance
-
Janitorial staff
Office Rental Rates:

TBD - property management contract in negotiations.
|